(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
This translation is a Google translation Terjemahan ini adalah terjemahan Google
* LS-N-PO will switch to LS-PO as soon as the stock runs out.
Part Number
Configured Part Number is shown.
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Screw Types | Nominal | Pitch, Number of Threading (mm) | Overall Length (L) (mm) | Class | Thread Length (mm) | Length under neck (mm) | Shank diameter (Ds) (mm) | Shank square width (K) (mm) | Shank square part length (mm) | Number of Grooves | Shape |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
395,919 IDR | 1 Piece(s) | 7 Day(s) or more | Meter | M6 | 1 | 150 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
357,447 IDR | 1 Piece(s) | 7 Day(s) or more | Meter | M10 | 1.5 | 82 ~ 100 | P3 | 24 | - | 7 | 5.5 | 8 | 3 | e | ||
474,634 IDR | 1 Piece(s) | 13 Day(s) or more | Meter | M2 | 0.4 | 70 | P2 | 7.2 | 12 | 3 | 2.5 | 5 | 3 | c | ||
411,976 IDR | 1 Piece(s) | Quote | Meter | M2.3 | 0.4 | 70 | P2 | 7.2 | 12 | 3 | 2.5 | 5 | 3 | c | ||
364,308 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M2.5 | 0.45 | 70 | P2 | 8.1 | 14 | 3 | 2.5 | 5 | 3 | c | ||
364,308 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M2.6 | 0.45 | 70 | P2 | 8.1 | 14 | 3 | 2.5 | 5 | 3 | c | ||
299,440 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M3 | 0.5 | 70 | P2 | 9 | 14 | 4 | 3.2 | 6 | 3 | c | ||
299,693 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M3 | 0.5 | 100 | P2 | 9 | 14 | 4 | 3.2 | 6 | 3 | c | ||
505,839 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M3 | 0.5 | 120 | P2 | 9 | 14 | 4 | 3.2 | 6 | 3 | c | ||
545,853 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M3 | 0.5 | 150 | P2 | 9 | 14 | 4 | 3.2 | 6 | 3 | c | ||
264,548 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M4 | 0.7 | 70 | P2 | 11 | 17 | 5 | 4 | 7 | 3 | c | ||
274,675 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M4 | 0.7 | 100 | P2 | 11 | 17 | 5 | 4 | 7 | 3 | c | ||
395,075 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M4 | 0.7 | 120 | P2 | 11 | 17 | 5 | 4 | 7 | 3 | c | ||
507,209 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M4 | 0.7 | 150 | P2 | 11 | 17 | 5 | 4 | 7 | 3 | c | ||
242,285 IDR | 1 Piece(s) | 9 Day(s) or more | Meter | M5 | 0.8 | 100 | P2 | 13 | 22 | 5.5 | 4.5 | 7 | 3 | c | ||
353,303 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M5 | 0.8 | 120 | P2 | 13 | 22 | 5.5 | 4.5 | 7 | 3 | c | ||
438,268 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M5 | 0.8 | 150 | P2 | 13 | 22 | 5.5 | 4.5 | 7 | 3 | c | ||
235,714 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M6 | 1 | 100 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
374,628 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M6 | 1 | 120 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
392,074 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M6 | 1 | 150 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
645,404 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M6 | 1 | 200 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
301,651 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 1/4-28UNF | - | 100 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
487,656 IDR | 1 Piece(s) | Quote | unified | 1/4-28UNF | - | 150 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
301,651 IDR | 1 Piece(s) | 13 Day(s) or more | unified | 1/4-20UNC | - | 100 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
487,656 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 1/4-20UNC | - | 150 | P2 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
368,731 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 5/16-24UNF | - | 100 | P2 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
604,370 IDR | 1 Piece(s) | Quote | unified | 5/16-24UNF | - | 150 | P2 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
444,411 IDR | 1 Piece(s) | 13 Day(s) or more | unified | 3/8-24UNF | - | 100 | P2 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
712,484 IDR | 1 Piece(s) | Quote | unified | 3/8-24UNF | - | 150 | P2 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
479,057 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M10 | 1 | 100 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
814,210 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M10 | 1 | 150 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
320,467 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M10 | 1.25 | 100 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
510,783 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M10 | 1.25 | 150 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
1,021,592 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M10 | 1.25 | 200 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
320,467 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M10 | 1.5 | 100 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
535,570 IDR | 1 Piece(s) | 13 Day(s) or more | Meter | M10 | 1.5 | 120 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
510,783 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M10 | 1.5 | 150 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
1,009,061 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M10 | 1.5 | 200 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
671,450 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M12 | 1 | 100 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | ||
1,114,717 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M12 | 1 | 150 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | ||
543,925 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M12 | 1.5 | 100 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | ||
876,866 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M12 | 1.5 | 150 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | ||
1,231,431 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M12 | 1.5 | 200 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | ||
1,101,695 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M14 | 1.5 | 150 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | ||
1,503,928 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M14 | 1.5 | 200 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | ||
855,676 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M16 | 1.5 | 150 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | ||
1,529,728 IDR | 1 Piece(s) | 13 Day(s) or more | Meter | M16 | 1.5 | 200 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | ||
426,720 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M3 | 0.5 | 100 | P3 | 9 | 14 | 4 | 3.2 | 6 | 3 | c | ||
782,021 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M3 | 0.5 | 150 | P3 | 9 | 14 | 4 | 3.2 | 6 | 3 | c | ||
390,354 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M4 | 0.7 | 100 | P3 | 11 | 17 | 5 | 4 | 7 | 3 | c | ||
726,244 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M4 | 0.7 | 150 | P3 | 11 | 17 | 5 | 4 | 7 | 3 | c | ||
343,669 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M5 | 0.8 | 100 | P3 | 13 | 22 | 5.5 | 4.5 | 7 | 3 | c | ||
569,234 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M5 | 0.8 | 150 | P3 | 13 | 22 | 5.5 | 4.5 | 7 | 3 | c | ||
298,211 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M6 | 1 | 100 | P3 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
508,296 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M6 | 1 | 150 | P3 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
385,931 IDR | 1 Piece(s) | 13 Day(s) or more | Meter | M8 | 1 | 100 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
634,593 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M8 | 1 | 150 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
270,129 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M8 | 1.25 | 100 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
450,799 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M8 | 1.25 | 120 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
488,552 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M8 | 1.25 | 150 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
924,781 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M8 | 1.25 | 200 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
368,731 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 5/16-18UNC | - | 100 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
604,370 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 5/16-18UNC | - | 150 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
444,411 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 3/8-16UNC | - | 100 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
712,484 IDR | 1 Piece(s) | 13 Day(s) or more | unified | 3/8-16UNC | - | 150 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
840,010 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 7/16-20UNF | - | 150 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | ||
840,010 IDR | 1 Piece(s) | Quote | unified | 7/16-14UNC | - | 150 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | ||
889,889 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 1/2-20UNF | - | 150 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | ||
1,253,054 IDR | 1 Piece(s) | Quote | unified | 1/2-20UNF | - | 200 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | ||
889,889 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 1/2-13UNC | - | 150 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | ||
1,253,054 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 1/2-13UNC | - | 200 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | ||
1,198,997 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 5/8-18UNF | - | 150 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | ||
1,555,773 IDR | 1 Piece(s) | Quote | unified | 5/8-18UNF | - | 200 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | ||
1,198,997 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 5/8-11UNC | - | 150 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | ||
1,555,773 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 5/8-11UNC | - | 200 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | ||
2,029,264 IDR | 1 Piece(s) | Quote | unified | 3/4-16UNF | - | 150 | P3 | 33 | - | 15 | 12 | 15 | 3 | e | ||
2,615,291 IDR | 1 Piece(s) | 11 Day(s) or more | unified | 3/4-16UNF | - | 200 | P3 | 33 | - | 15 | 12 | 15 | 3 | e | ||
2,809,896 IDR | 1 Piece(s) | Quote | unified | 7/8-14UNF | - | 200 | P3 | 33 | - | 17 | 13 | 16 | 3 | e | ||
- | 1 Piece(s) | Quote | Whitworth | 1/4W20 | - | 100 | P3 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
487,656 IDR | 1 Piece(s) | 11 Day(s) or more | Whitworth | 1/4W20 | - | 150 | P3 | 15 | 26 | 6 | 4.5 | 7 | 3 | c | ||
- | 1 Piece(s) | Quote | Whitworth | 5/16W18 | - | 100 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
604,370 IDR | 1 Piece(s) | 11 Day(s) or more | Whitworth | 5/16W18 | - | 150 | P3 | 19 | - | 6.2 | 5 | 8 | 3 | e | ||
- | 1 Piece(s) | Quote | Whitworth | 3/8W16 | - | 100 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
712,484 IDR | 1 Piece(s) | 13 Day(s) or more | Whitworth | 3/8W16 | - | 150 | P3 | 23 | - | 7 | 5.5 | 8 | 3 | e | ||
803,398 IDR | 1 Piece(s) | Quote | Whitworth | 7/16W14 | - | 150 | P3 | 26 | - | 8.5 | 6.5 | 9 | 3 | e | ||
889,889 IDR | 1 Piece(s) | 13 Day(s) or more | Whitworth | 1/2W12 | - | 150 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | ||
1,253,054 IDR | 1 Piece(s) | 11 Day(s) or more | Whitworth | 1/2W12 | - | 200 | P3 | 26 | - | 10.5 | 8 | 11 | 3 | e | ||
1,198,997 IDR | 1 Piece(s) | 13 Day(s) or more | Whitworth | 5/8W11 | - | 150 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | ||
1,555,773 IDR | 1 Piece(s) | Quote | Whitworth | 5/8W11 | - | 200 | P3 | 26 | - | 12.5 | 10 | 13 | 3 | e | ||
701,672 IDR | 1 Piece(s) | 11 Day(s) or more | Meter | M10 | 1.5 | 150 | P4 | 23 | - | 7 | 5.5 | 8 | 3 | e |
Loading...
Chamfer threads | 5P | Tool Material Type | High-speed steel | Tap Type | Point tap |
---|---|---|---|---|---|
Hole type | For through hole | Coating Y/N | NA |
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
How can we improve?Bagaimana Kami bisa meningkatkan Pelayanan?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Kebijakan Privacy
Thank you for your cooperation.Terima kasih atas kerjasama anda.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy Walaupun Kami tidak dapat langsung menjawab saran yang ditulis di lembar ini, informasinya akan kami review untuk peningkatan pelayanan dikemudian hari
Silahkan pergunakan Forms Permintaan.
Kebijakan Privacy